# Chinese New Year 2027: the week-by-week message calendar for your supplier on WeChat

> Official dates for Chinese New Year 2027 and the week-by-week calendar for writing to your Chinese supplier on WeChat, with the messages.

- **Source (source):** https://aitoolsforapps.com/wechat-stickers-posters-with-your-qr-and-messages-to-chinese-suppliers-241/blog/chinese-new-year-2027-supplier-message-calendar
- **Platform (platform):** AiToolsForApps
- **Language (language):** en
- **Updated (updated):** 2026-11-20

## In summary

- The **Chinese New Year 2027 falls on Saturday, February 6**, and the Chinese State Council set the official holiday for the Spring Festival on **9 days, from February 5 to 13**, with Sundays, January 31 and February 14, as compensatory working days.
- The official holiday lasts 9 days; the **actual downtime for your order lasts between 4 and 6 weeks**, because the factory slows down from mid-January and takes another 2–4 weeks to regain capacity.
- Between **10% and 30% of the workers do not return** after the holiday, and that affects the payment terms and the quality of the first batch.
- There are five messages that need to be sent **in this order**: closing and reopening dates, closing the order before the cutoff, payment and invoice before the company account closes, inspection before the downtime, and the actual deadline for the first batch in March.
- The pre-shipment inspection must be completed **before mid-January 2027**: inspection companies also close, and if you miss the next slot, it’s March.

If you buy from China, the 2027 calendar is dictated by a date that has already been published: February 6. What decides whether your container leaves or stays at the dock is not that date, but what you write on WeChat in the twelve weeks prior and the order in which you write it. This article is that timeline, milestone by milestone, with the specific message that needs to be sent at each moment and the Chinese terminology that is most often misspelled. If you also want the texts already drafted in Chinese, AiToolsForApps maintains aiWeChat, a set of [AI tools to communicate with Chinese suppliers via WeChat](/wechat-stickers-posters-with-your-qr-and-messages-to-chinese-suppliers-241) with a bilingual catalog of messages and a glossary of trade terms with their pinyin.

![Desk of an importing SME at sunset with a laptop, mobile, wall planner, and sample boxes, with blurred red lanterns in the background](https://cdn.aistohire.com/i/6815-sknh-izag-tmwz-lfsn.webp)

## When exactly does China close for the Chinese New Year 2027?

Chinese New Year 2027 is on **Saturday, February 6** (Year of the Fire Goat) and the official holiday for the Spring Festival runs **from Friday, February 5 to Saturday, February 13, 2027, for nine days**, according to the notice from the General Office of the State Council published on November 5, 2026. That same notice makes Sundays **January 31 and February 14** working days, which are the compensatory days of the bridge.

This detail of the official calendar is important for two practical reasons. The first: the holiday in 2027 is **longer than what the guides published before November 2026 anticipated**, which assumed a closure from February 5 to 12; the official notice adds the 13th. The second: Sunday the 14th is a working day on paper, so you will see suppliers saying they "open on the 14th" when in reality there will be hardly any staff that day.

| Date 2027 | What is it | Source |
|---|---|---|
| Sunday, January 31 | Compensatory working day | [Notice from the State Council](https://www.gov.cn/zhengce/content/202611/content_7085101.htm), 11-5-2026 |
| Friday, February 5 | Chinese New Year's Eve (除夕), first day of holiday | Notice from the State Council |
| Saturday, February 6 | Chinese New Year | Notice from the State Council |
| Saturday, February 13 | Last day of official holiday (9 days in total) | [Xinhua](https://www.news.cn/politics/20261105/378198bc10ba4d1b83837c64fef5d28b/c.html), 11-5-2026 |
| Sunday, February 14 | Compensatory working day | Notice from the State Council |
| Saturday, February 20 | Lantern Festival (元宵节) | [New Buying Agent](https://www.newbuyingagent.com/resources/chinese-new-year-2027-february-6-the-china-production-schedule-survival-guide), consulted 11-12-2026 |

And there is a factor that does not appear in any work calendar: *chunyun*, the internal migration of workers. In 2026, the transport period for the Spring Festival started on February 2, lasted 40 days, and moved **more than 630 million trips** between rail and air travel, [according to the count published by Chinese economic media](https://finance.eastmoney.com/a/202601193622768569.html) on January 19, 2026. That’s why the worker in your factory doesn’t leave on the 5th: they leave when they have a ticket.

## The real slowdown lasts between 4 and 6 weeks, not nine days

If you plan against the official nine days, you are too late. The realistic interruption window is **4 to 6 weeks**: two to four weeks of slowdown before the holiday, the nine days of closure, and two to four weeks of recovery afterward. The sector guidelines for 2026 agree that what is most underestimated is not the closure, but the ramp back.

The drop in production before the holiday follows a fairly stable pattern, described in the [2027 Chinese New Year Production Calendar Guide by New Buying Agent](https://www.newbuyingagent.com/resources/chinese-new-year-2027-february-6-the-china-production-schedule-survival-guide) (accessed on 12-11-2026):

| Moment | Factory Capacity | What it means for you |
|---|---|---|
| 2 weeks before (end of January) | ~80% of normal | You can still catch up on a small delay |
| 1 week before | ~60% | No more specification changes allowed |
| 3–4 days before | ~30–40% | Only what is almost finished is closed |
| Eve (February 5) | less than 20% | Only administration and monitoring |
| Week 1 after the holiday (February 14–19) | 40–60% | Peak of quality issues |
| Weeks 2–3 (February 20 – March 5) | 60–80% | Incomplete workforce |
| Week 4 and beyond (from ~March 8) | Almost normal | Deadlines are reliable again |

![Assembly line of a Chinese factory at half shift before the holiday, with half of the positions empty and suitcases stacked against the wall](https://cdn.aistohire.com/i/1948-jdsp-syxa-psql-dzdk.webp)

The reason the ramp is so slow is the turnover of staff. Between **10% and 30% of workers do not return** after the holiday, a range covered by the [2027 Chinese New Year Factory Shutdown Analysis by EasyImex](https://easyimex.com/blog/china-factory-shutdown-chinese-new-year-2027/) (accessed on 12-11-2026); the same source points out that factories in Guangdong take 3–4 weeks to return to full capacity. New Buying Agent breaks it down to 30–50% returning the first week, 40–60% in weeks two and three, and 10–20% never returning. The new worker who takes that position needs to be retrained on your product, and you will notice that in the first batch of March.

The effect also reaches freight. In February 2026, there were **136 canceled departures** on the main routes according to Drewry, and Xeneta recorded **135,800 TEU withdrawn** from the Far East–North Europe route by the end of February, figures collected in the [Freight Booking Guide Before the 2027 Chinese New Year by Sorva](https://sorvatrade.com/en/guide/fret-avant-nouvel-an-chinois-2027-reserver) (accessed on 12-11-2026). That same guide places the estimated peak of bookings in the week of **January 9 to 16, 2027** and reminds you to tell the supplier as it is: there is no single cutoff date for Chinese ports, each departure has its own documentation and loading cutoff.

## Week-by-week calendar: what to send to the supplier and when

The order matters more than the content. First, dates are confirmed, then the scope is finalized, then the money and paperwork are settled, and only at the end is quality and turnaround time considered: if you reverse the order, you negotiate the inspection when the factory no longer has time to redo anything. This is the schedule for the Chinese New Year 2027.

| When | Milestone | Message to send |
|---|---|---|
| November 2026 | Closing and reopening dates | Request the factory's holiday notice in writing |
| Early December 2026 | Order closed | Confirm end of production date and loading date |
| Mid-December 2026 | Freight space | Request a quote and reserve as soon as there is a loading date |
| January 1–10, 2027 | Production completed | Close the last batch arriving at the end of February |
| Before January 15, 2027 | Pre-shipment inspection | Schedule the inspection with the control company |
| Last week of January 2027 | Payment and invoice | Balance paid and VAT invoice issued |
| February 4–5, 2027 | Holiday greeting | Personal congratulations, without asking for anything |
| February 16–19, 2027 | Actual post-holiday deadline | Confirm date of the first batch, not "soon" |

### November: confirm the closing and reopening dates

The first message does not ask for prices: it requests the **factory's holiday notice** (放假通知) with both dates, the closing date and the reopening date, and the name of the person who will be reachable during the break. Many factories stop accepting new orders six to eight weeks before the holiday, so in November you still have time, and in January you do not.

> Good afternoon. To plan our orders for the first quarter, could you please confirm in writing the exact closing and reopening dates of the factory for the Spring Festival, and until what date you accept new orders? Who will be reachable during the holiday?
>
> 请问工厂春节放假和开工的具体时间？最晚什么时候还能下新订单？放假期间谁可以联系？

Request both dates in the same message. If you only ask about the closing, they will respond with the closing; and the date you really need to promise something to your client is the reopening date.

### Early December: close the order before the cutoff

This message turns a conversation into an order with a date. For sea shipments with production lead times of 30 days or more, **November 2026 is the last reasonable time to place the order** and December is for air shipments, according to EasyImex. In December, what is finalized are the two dates you will actually use: end of production and container loading.

> We confirm the order with the quantities in the attached table. I need two dates in writing: end of production date and container loading date, both before the closure for the Spring Festival. If either of the two does not make it before the closure, let me know now and we will split the order into two shipments.
>
> 订单确认。请书面确认两个日期：生产完成日期和装柜日期，都要在春节放假之前。如果来不及，请现在告诉我们，我们分两批出货。

The phrase that saves the most headaches is the last one: offering to split the order. A supplier will rarely tell you on their own that they cannot meet the deadline; if you give them an out that is not "lose the order," they will tell you the truth.

### Last week of January: payment and invoice, before the company account closes

Here is the most expensive error in the calendar. The **company account** (对公账户) and the factory's accounting department close before the plant, and the issuance of the VAT invoice depends on that department, not on the salesperson you are dealing with via WeChat. If you leave the balance and the invoice for February 4, you will be without documentation until mid-February.

Since **December 1, 2024**, China has been applying a fully digitized electronic invoice (数电发票) nationwide, which has [the same legal validity as paper invoices according to the announcement by the State Administration of Taxation](https://fgk.chinatax.gov.cn/zcfgk/c100012/c5236067/content.html). That does not mean it is issued by a machine without intervention: there is still a person in accounting who issues it, and that person also goes on vacation.

> Before your accounting closes for the holiday, we need to settle the money and paperwork: I will send you the proof of the balance transfer and ask you to issue the VAT invoice with the tax information you already have, and send it to me in PDF before the closure. Please confirm the last day your accounting can issue invoices.
>
> 放假前请先处理付款和发票。尾款的水单我已经发给您，请按我们的开票资料开增值税专用发票，并在放假前把PDF发给我。请告诉我们财务最晚哪一天可以开票。

And a warning that both consulted guides repeat: **do not pay 100% in advance to a factory that is going on break**. EasyImex states this unequivocally: structure the payment to maintain leverage until production is confirmed as completed.

## The inspection is requested before the break, not after

The pre-shipment inspection must be completed **before mid-January 2027**, because independent quality control companies also suspend their activities during the break: if you miss that window, the next real slot is **March 2027**, according to EasyImex. In other words: an inspection "after the holiday" is not an inspection later, it is a shipment a month and a half later.

![Quality inspector measuring with a tape measure a cardboard box on a pallet of sealed boxes in the factory warehouse](https://cdn.aistohire.com/i/7680-ktrs-yghm-vcgp-xbiw.webp)

There is a second reason to bring it forward, and it is leverage. If you inspect with the factory at full capacity, a defect is redone. If you inspect with the factory at 30% capacity, the defect is "negotiated". And if you inspect in March, it is redone by a workforce that is partly new.

> We want to conduct the pre-shipment inspection before January 15, with production at 100% and packaging completed. What day will everything be ready for inspection? Inform the factory that an external inspector will be coming and we need the boxes to be palletized and labeled.
>
> 我们希望在1月15日之前安排验货，货要全部生产完、包装好。请问哪一天可以验货？请通知工厂，会有第三方验货员过来，外箱需要打托盘、刷好唛头。

And also request in the same message the photos of the load (装柜照片). They do not replace the inspection, but they are all you will have if something falls off the calendar.

## The terminology that is always written wrong in Chinese

80% of misunderstandings with a Chinese supplier are not about price, they are about unit of measure and type of document. These are the terms that should always be written in Chinese, even if the rest of the message is in English, because the automatic translator systematically distorts them.

| Concept | Chinese | Pinyin | Where it breaks |
|---|---|---|---|
| Minimum Order Quantity (MOQ) | 最小起订量 | zuìxiǎo qǐdìngliàng | "Minimum order" is sometimes translated as minimum order in euros, not in pieces |
| Pieces / units | 个 o 件 | gè / jiàn | They quote by piece and you read by box |
| Outer box | 外箱 | wàixiāng | "Box" can be the individual product box (彩盒) |
| Pallet | 托盘 | tuōpán | "Pallet" without specifying if it is palletized or bulk |
| Volume in cubic meters (CBM) | 立方米 o 体积 | lìfāngmǐ / tǐjī | A miscalculated CBM changes the freight, not the product price |
| Packaging marks | 唛头 | màitóu | Without them, the warehouse does not identify your goods |
| Incoterms | 贸易术语 | màoyì shùyǔ | FOB, EXW or DDP without a port behind them mean nothing |
| Container loading | 装柜 | zhuāngguì | It is not the same as "end of production" |
| Delivery time | 交货期 | jiāohuòqī | Sometimes they count from payment, not from order |
| Deposit | 定金 o 预付款 | dìngjīn / yùfùkuǎn | Mixed with the balance in a single amount |
| Balance | 尾款 | wěikuǎn | Paid against a copy of documents, not before |
| Transfer receipt | 水单 | shuǐdān | They always ask for it and you don't know what it is |
| Company account | 对公账户 | duìgōng zhànghù | If they give you a personal account, there is a problem |
| Invoice (generic) | 发票 | fāpiào | It is not your commercial invoice, it is the Chinese tax document |
| VAT invoice | 增值税专用发票 | zēngzhíshuì zhuānyòng fāpiào | The 普通发票 does not serve for the same purpose |
| Goods inspection | 验货 | yànhuò | "QC" alone can be the factory's self-inspection |
| Holiday notice | 放假通知 | fàngjià tōngzhī | The document you want to request in November |

Two rules about the language. The first: write the number and the unit together and in Chinese (`5000个`, `200外箱`, `18立方米`), because numbers are not translated incorrectly but units are. The second: when you send a term in Chinese, send it with the English equivalent next to it in parentheses. It is not redundancy; it is the way for the other party to detect the misunderstanding before manufacturing.

This is, in fact, the part where AiToolsForApps built aiWeChat: the app carries a bilingual message catalog organized by situation —order, delay, samples, payment, quality, and relationship— with the Chinese already written and variables to fill in the product and quantity, and a glossary of trade terms with Chinese, pinyin, and a note on when each one is used. If you want to customize a message with AI, it marks it as unreviewed text, precisely because a poorly placed nuance in a payment message is costly. It does not connect to your WeChat account, does not send anything, and has no relation to Tencent: it produces the texts and files, and you send them yourself.

## Why the holiday greeting is sent and not skipped

Because the business relationship with a Chinese supplier is sustained in the personal relationship, and the Spring Festival is the occasion of the year when that relationship is recognized. Sending the greeting takes thirty seconds and is what makes your order in March be at the top of the pile and not at the bottom, when the factory has half the staff and more orders than shifts.

Three conditions for it to work. It must be **personal**, not a forward with your logo. It should **not ask for anything**: neither a date, nor a discount, nor a confirmation; if you include a question in the same message, it becomes a work message. And it should arrive **on February 4 or 5**, not on the 10th, when they are already with family.

> Happy New Year! Thank you for the work this year. Wishing you and your family good health and much prosperity in the Year of the Goat.
>
> 新年快乐！感谢您今年的帮助。祝您和家人身体健康，生意兴隆！

If you have regular contact with the same person for years, 恭喜发财 (*gōngxǐ fācái*, "may you prosper") is the most common colloquial formula and is understood as closeness. What is not advisable is to turn the greeting into a business act: here the sender is a person, not a brand.

## The first post-holiday batch: how to close a real deadline

The message from February 16 or 17 does not ask "when do you have it?". It asks **how many workers have returned and on what specific day your batch will be finished**, because the answer "soon" in the week of February 14 means March. The factory operates at 40–60% in that first week and you compete with all the other customers who also sent the same message.

![Chinese factory resuming production after the New Year with the line at half staff and red lanterns still hanging from the ceiling](https://cdn.aistohire.com/i/9641-snru-lfrt-gcmx-jonk.webp)

> How is the return to work going? To be able to give a date to our clients I need three pieces of information: what percentage of the staff has returned, what day our order production starts, and what day it will be finished. With incomplete staff, we prefer a realistic deadline over an optimistic one.
>
> 工人回来得怎么样了？为了给客户答复，我需要三个信息：返工比例、我们订单的开始生产日期和完成日期。人手不齐的情况下，我们希望您给一个实际的交货期。

And a quality precaution: the first batch after the holiday is, according to the two consulted guides, the one that concentrates the peak of incidents, because part of the line is new personnel. If your product has any critical assembly points, that is the order in which it is worth an inspection during production and not just at the end.

## Five costly mistakes in the 2027 calendar

Almost all the mistakes in this calendar are order mistakes, not content mistakes: the importer sends the correct message at the wrong time. These are the five that are most repeated.

1. **Planning against the nine official days** instead of against the 4–6 weeks of actual interruption.
2. **Placing the order in January.** Many factories have already stopped accepting new orders six to eight weeks before the holiday.
3. **Leaving the balance and VAT invoice for the last days**, when accounting and the company account have already closed.
4. **Postponing the inspection to after the holiday**, which in practice means March and with partially new staff.
5. **Accepting an "ok, no problem" as a deadline.** Without a written production end date and loading date, there is no deadline.

## Frequently asked questions

### What day is Chinese New Year 2027 and how many days do factories close?

Chinese New Year 2027 is Saturday, February 6. The official holiday is nine days, from February 5 to 13, according to the State Council notice of November 5, 2026. In practice, the factory stops producing at normal pace from mid-January and does not regain full capacity until early March.

### Until when can I place an order in China to ship before Chinese New Year 2027?

For sea freight with a production lead time of 30 days or more, November 2026 was the last reasonable moment; for air freight, December 2026. If you want goods arriving in Europe by the end of February, production had to be finished around January 10, 2027. Many factories stop accepting new orders between six and eight weeks before the holiday.

### When do I have to book the container before Chinese New Year 2027?

The peak of bookings is estimated to be in the week of January 9 to 16, 2027, so it is advisable to have the space reserved in December 2026, as soon as you have a loading date. There is no single cut-off date for Chinese ports: each departure has its own closure, set by the shipping company and the terminal.

### Why don't all workers return after Chinese New Year?

Because the Spring Festival is the time of year when migrant workers return to their provinces, and many take the opportunity to change jobs or stay. Industry estimates place the proportion that does not return between 10% and 30%, which extends deadlines and concentrates defects in the first batch.

### What is a 发票 and how does it differ from my commercial invoice?

The 发票 (*fāpiào*) is the official Chinese tax document, issued through the State Administration of Taxation system, and it is not the same as the *commercial invoice* you use for customs. The variant that usually interests you is the 增值税专用发票, the special invoice with VAT. Since December 1, 2024, the fully digitized version has the same legal validity as the paper one.

### Do I need to wish a Happy Chinese New Year to a supplier?

Yes, and it is advisable to send it on February 4 or 5, before the holiday starts. It must be a personal message that does not ask for anything: no dates, no prices, no confirmations. It is the cheapest investment you can make in the priority that your order will have in March.

### Can I write to the supplier in English or is it better in Chinese?

The export salesperson usually speaks English, but it is advisable to always write the unit and document terms in Chinese alongside the English term: MOQ, pieces, boxes, pallets, CBM, Incoterms, company account, and type of invoice are the points where misunderstandings can cost money.

## What you take away from here

The Chinese New Year 2027 calendar is not improvised in January: it is written in November. The dates are already published —February 6, holiday from 5 to 13— and the only thing left to decide is whether your five messages go out in order or if they all arrive together in the last week. Ask for the holiday notice now, close the order in December, the money and the invoice in January, the inspection before the 15th, the greeting on the 4th, and the real deadline on February 16.

If the part that holds you back is writing that in Chinese without losing the nuance, AiToolsForApps has set up aiWeChat just for this: [ready messages in Chinese for suppliers and a trade glossary with pinyin](/wechat-stickers-posters-with-your-qr-and-messages-to-chinese-suppliers-241), organized by situation —order, delay, samples, payment, quality, and relationship— and with the terms that are most often misspelled already resolved. It is used without registering and does not connect to your account: you send the messages.

> Try aiWeChat for free and without registration: choose the situation —order, payment, delay, quality— and get the pre-written message in Chinese, along with the glossary of MOQ, CBM, Incoterms, and VAT invoice at hand.

- [WeChat — Stickers at exact sizes, posters with your own QR code, and work messages in Chinese](https://aitoolsforapps.com/wechat-stickers-posters-with-your-qr-and-messages-to-chinese-suppliers-241)

## About the platform

**WeChat — Stickers at exact sizes, posters with your own QR code, and work messages in Chinese** — an app by AiToolsForApps. Available at: https://aitoolsforapps.com/wechat-stickers-posters-with-your-qr-and-messages-to-chinese-suppliers-241/blog/chinese-new-year-2027-supplier-message-calendar

### Other languages

- `es`: https://aitoolsforapps.com/es/wechat-pegatinas-carteleria-con-tu-qr-y-mensajes-a-proveedores-chinos-241/blog/ano-nuevo-chino-2027-calendario-mensajes-proveedor-wechat
- `fr`: https://aitoolsforapps.com/fr/wechat-autocollants-affiches-avec-votre-qr-code-et-messages-aux-fournisseurs-chinois-241/blog/nouvel-an-chinois-2027-calendrier-messages-fournisseur-wechat
- `it`: https://aitoolsforapps.com/it/wechat-adesivi-cartellonistica-con-il-tuo-qr-code-e-messaggi-ai-fornitori-cinesi-241/blog/capodanno-cinese-2027-calendario-messaggi-fornitore-wechat
- `pt`: https://aitoolsforapps.com/pt/wechat-adesivos-sinaletica-com-o-seu-qr-code-e-mensagens-para-fornecedores-chineses-241/blog/ano-novo-chines-2027-calendario-mensagens-fornecedor-wechat
- `de`: https://aitoolsforapps.com/de/wechat-sticker-poster-mit-deinem-qr-code-und-nachrichten-an-chinesische-lieferanten-241/blog/chinesisches-neujahr-2027-nachrichtenkalender-anbieter-wechat
- `bg`: https://aitoolsforapps.com/bg/wechat-prevarnete-izobrazhenie-v-stiker-240-240-otpechatayte-svoya-qr-i-pishete-na-kitayskiya-si-dostavchik-241/blog/kitayska-nova-godina-2027-kalendar-saobshteniya-dostavchik-wechat
- `ja`: https://aitoolsforapps.com/ja/wechat-sticker-qr-poster-chugokugo-message-241/blog/shunsetsu-2027-chugoku-supplier-wechat-message-calendar
- `sv`: https://aitoolsforapps.com/sv/wechat-gor-en-bild-till-240-240-sticker-skriv-ut-din-qr-och-skriv-till-din-kinesiska-leverantor-241/blog/kinesiska-nyaret-2027-kalender-meddelanden-leverantor-wechat
- `nl`: https://aitoolsforapps.com/nl/wechat-zet-een-afbeelding-om-in-een-sticker-van-240-240-druk-je-qr-af-en-schrijf-je-chinese-leverancier-241/blog/chinees-nieuwjaar-2027-berichtenkalender-leverancier-wechat
- `ko`: https://aitoolsforapps.com/ko/wechat-sticker-qr-poster-chinese-business-messages-241/blog/2027-jungguk-seolnal-gongeupeobche-wechat-mesiji-ilijeongpyo
- `da`: https://aitoolsforapps.com/da/wechat-goer-et-billede-til-et-klistermaerke-pa-240-240-print-din-qr-og-skriv-til-din-kinesiske-leverandoer-241/blog/kinesisk-nytaar-2027-tidsplan-beskeder-leverandoer-wechat
- `ar`: https://aitoolsforapps.com/ar/wechat-hul-sura-ila-mlsq-240-240-watba-rmz-qr-alkhas-bk-wrasl-murdk-alsini-241/blog/ras-alsana-alsiniya-2027-jadwal-rasail-almawrid-wechat
- `cs`: https://aitoolsforapps.com/cs/wechat-preved-obrazek-na-samolepku-240-240-vytiskni-svuj-qr-kod-a-pis-cinskemu-dodavateli-241/blog/cinsky-novy-rok-2027-kalendar-zprav-dodavateli-wechat
- `no`: https://aitoolsforapps.com/no/wechat-gjoer-et-bilde-om-til-klistremerke-pa-240-240-skriv-ut-qr-koden-din-og-skriv-til-den-kinesiske-leverandoeren-din-241/blog/kinesisk-nyttar-2027-kalender-meldinger-leverandor-wechat
- `he`: https://aitoolsforapps.com/he/wechat-hpok-tmonh-lmdbkh-240-240-hdps-at-h-qr-shlk-vktob-lspk-hsini-241/blog/chinese-new-year-2027-wechat-supplier-message-calendar
- `id`: https://aitoolsforapps.com/id/wechat-ubah-gambar-menjadi-stiker-240-240-cetak-qr-anda-dan-tulis-ke-pemasok-tiongkok-anda-241/blog/tahun-baru-imlek-2027-kalender-pesan-pemasok-wechat
- `zh`: https://aitoolsforapps.com/zh/wechat-stickers-qr-posters-supplier-messages-241/blog/chinese-new-year-2027-wechat-supplier-message-calendar
- `pl`: https://aitoolsforapps.com/pl/wechat-zamien-obraz-w-naklejke-240-240-wydrukuj-swoj-qr-i-napisz-do-chinskiego-dostawcy-241/blog/chinski-nowy-rok-2027-kalendarz-wiadomosci-dostawca-wechat
- `fi`: https://aitoolsforapps.com/fi/wechat-muuta-kuva-240-240-tarraksi-tulosta-qr-koodisi-ja-kirjoita-kiinalaiselle-toimittajalle-241/blog/kiinan-uusi-vuosi-2027-wechat-viestit-toimittajalle-kalenteri
